A finished resin bound driveway meeting dark granite paving along a granite sett edge

Driveways & paving

Laid on ground that was prepared properly.

Resin bound, resin bond, paving and patios. The surface is the part you see; the dig, the sub-base and the drainage are the part that decides how long it lasts.

What we lay

Surfaces, and what each one suits.

Which is right depends on the ground, the fall of the site and the look you are after. We will say so if the one you asked for is the wrong call for your driveway.

Smooth & seamless

Resin bound

Stone and resin mixed together and trowelled out to a smooth, seamless finish. Water passes straight through it, so puddles have nowhere to sit and nothing runs off across the footpath.

Textured & hard wearing

Resin bond

Stone scattered onto a resin layer for a rougher, higher-grip surface. Harder wearing underfoot, and usually the cheaper of the two.

Stone & block

Paving & patios

Slabs, setts and block paving, laid to a proper fall so water goes where it should. The same groundwork rules apply underneath.

Why two quotes differ by thousands

A driveway is mostly the part you never see.

Two driveways can look identical from the road and come in thousands apart. What moves the number is underneath: how deep the sub-base has to go, whether the ground holds water, how bad the levels are, and whether a machine can get in or it all comes out by barrow.

Skip that and the surface goes first. It sinks at the wheel tracks, it cracks at the edges, and the only real fix is lifting it and starting again.

Quotes are free and itemised by stage, so you can see what the groundwork costs separately from the surface.

A finished resin bound driveway seen along its granite sett edge

Running the job

How a driveway actually goes.

  1. You get in touch

    Ring or send the details on WhatsApp with a photo. I come back to you to talk it through and look at it properly.

  2. Free quote

    Itemised by stage, groundwork separated from surface, with dates on it.

  3. Dig out & base

    Old surface lifted, dug to depth, edgings set, sub-base compacted. Drainage sorted while the ground is open.

  4. Surface & finish

    Resin or paving laid, edges cut in, site swept and cleared before we pull out.

Thinking about the driveway?

Send a photo of it and I will tell you straight what it needs and what is involved.

Call now Get a quote